We are often tasked with providing access to structurally sensitive buildings of great historical importance or significance where care of the fabric of the structure is of paramount importance.
We propose detailed and cost effective design solutions to overcome technical challenges, often engaging with the clients architects and engineers at early stages to develop schemes in a collaborative manner.
Bolton at Home
Thornbank Towers, Bolton
Project Budget:
£290,000
Project Scope:
The work includes the replacement of pitched roofs on each of the three blocks,replacement of all the buildings’ windows, installation of insulation and localised redecoration.
Laing O’Rourke Construction Ltd
Manchester Town Hall and Central Library
Project Budget:
£2,000,000
Project Scope:
Complex scaffolding to fully refurbish the Grade 1 listed building, with many designed scaffolds including temporary roofs, cantilevered drop scaffold to circular library.
Tube & FittingScaffolding | LAYHER SystemScaffolding |
✓ | ✓ |
Shepherd Construction Ltd
Trafford Town Hall
Project Budget:
£150,000
Project Scope:
Independent scaffolds to facades for refurbishment works and extension to Grade 2 listed building.
Stone Edge Ltd
The Piece Hall, Halifax
Project Budget:
£300,000
Project Scope:
Full refurbishment of Halifax’s historic Grade 1 listed building which is over 200 years old. Layher Allround modular system scaffold utilised to allow full access through the scaffold to multiple trades
Tube & FittingScaffolding | LAYHER SystemScaffolding |
✓ | ✓ |
Vinci Construction UK Ltd
Arkwright House, Manchester
Project Budget:
£250,000
Project Scope:
Busy city centre re-development of office building. Complex designed beam work protection gantry scaffold over busy roadway.
Balfour Beatty Construction Ltd
Aloft Hotel, Liverpool
Project Budget:
£350,000
Project Scope:
Busy city centre re-development of boutique hotel. Full scaffolding to facade and internal access solutions
Tube & FittingScaffolding | LAYHER SystemScaffolding |
✓ | ✓ |
Keepmoat Ltd
The Ashton Memorial and Butterfly House, Lancaster
Project Budget:
£100,000
Project Scope:
Full internal birdcage to facilitate refurbishment of the internal areas of this Grade 1 listed structure. Complex access issues had to be overcome to allow pre-booked functions to take place with minimal disruption.
BAM Construction Limited
Fire & Ambulance Station, Wrexham
Project Budget:
£120,000
Project Scope:
Supporting the Welsh Ambulances Services Trust new £15m home in North Wales with a range of scaffolding.
Tube & FittingScaffolding | LAYHER SystemScaffolding |
✓ | ✓ |
Conlon Construction Limited
Heaton Hall, Manchester
Project Budget:
£50,000
Project Scope:
Scaffolding works to facilitate a £2m restoration of Manchester’s historic Heaton Hall.
Tube & FittingScaffolding | LAYHER SystemScaffolding |
✓ | ✓ |
Conlon Construction Limited
Winter Gardens, Blackpool
Project Budget:
£440,000
Project Scope:
Traditional and Layher system scaffold and construction hoists were used in the refurbishment of an iconic, listed, Blackpool landmark.
LAYHER SystemScaffolding | ConstructionHoists |
✓ | ✓ |
Engie
Maritime Museum, Lancaster
Project Budget:
£30,000
Project Scope:
Scaffolding to support work on the museum housed in an 18th Century customs house at St George’s Quay.
Tube & FittingScaffolding | LAYHER SystemScaffolding |
✓ | ✓ |
Engie
National Football Museum, Manchester
Project Budget:
£10,000
Project Scope:
A city center project involving both tube and fitting scaffold and the Layher system.
Tube & FittingScaffolding | LAYHER SystemScaffolding |
✓ | ✓ |
Galliford Try Construction Limited
Linthwaite House Hotel, Windermere
Project Budget:
£90,000
Project Scope:
Scaffolding works to support redevelopment of a property originally built in 1901 featuring load bearing dry stone walls.
Tube & FittingScaffolding | LAYHER SystemScaffolding |
✓ | ✓ |
Galliford Try Construction Limited
One Smithfield Square, Manchester
Project Budget:
£260,000
Project Scope:
An award winning project on the site of Manchester’s former meat and fish market utilized our expertise in combined access solutions and hoists.
Tube & FittingScaffolding | LAYHER SystemScaffolding | Mast ClimbingWork Platforms | ConstructionHoists |
✓ | ✓ | ✓ | ✓ |
Manchester Working
Charlestown Towers
Project Budget:
£1,250,000
Project Scope:
A combined access approach featuring tube and fitting and Layher system scaffold along with mast climbers and work platforms.
Tube & FittingScaffolding | LAYHER SystemScaffolding | Mast ClimbingWork Platforms |
✓ | ✓ | ✓ |
Modus Workspace Limited
St James House, Telford
Project Budget:
£185,000
Project Scope:
The transformation of a former HMRC building requiring both scaffolding solutions and construction hoists.
Tube & FittingScaffolding | LAYHER SystemScaffolding | ConstructionHoists |
✓ | ✓ | ✓ |
Morgan Sindall plc
The Deanery School, Wigan
Project Budget:
£180,000
Project Scope:
Scaffolding to enable the construction of a new high school and sixth form for up to 150o students.
Tube & FittingScaffolding | LAYHER SystemScaffolding |
✓ | ✓ |
Morgan Sindall PLC
Islington Wharf, Manchester
Project Budget:
£800,000
Project Scope:
The redevelopment for mixed use included a combined approach to access with scaffolding, hoists and mast climbing work platforms.
Tube & FittingScaffolding | LAYHER SystemScaffolding | Mast ClimbingWork Platforms | ConstructionHoists |
✓ | ✓ | ✓ | ✓ |
Precision Facades Limited
iQ Steel, Sheffield
Project Budget:
£220,000
Project Scope:
Façade installation to a student accommodation block in the center of Sheffield requiring both tube and Layher system scaffold and mast climbers.
Tube & FittingScaffolding | LAYHER SystemScaffolding | Mast ClimbingWork Platforms |
✓ | ✓ | ✓ |
Willmott Dixon Construction Limited
Schuster Annexe, Manchester
Project Budget:
£75,000
Project Scope:
A major extension to the University of Manchester’s Schuster Building facilitated by our scaffolding expertise.
Tube & FittingScaffolding | LAYHER SystemScaffolding |
✓ | ✓ |
Bell Building Projects Limited
Express Networks 2, Manchester
Project Budget:
£300,000
Project Scope:
A project involving both scaffolding and construction hoists over the 6 stories of a combined residential/commercial steel-framed building.
Tube & FittingScaffolding | LAYHER SystemScaffolding | ConstructionHoists |
✓ | ✓ | ✓ |
Seddon Construction
Thornbank Towers, Bolton
Project Budget:
£300,000
Project Scope:
A project requiring a range of scaffolding solutions, mast climbers with work platforms and construction hoists.
Tube & FittingScaffolding | LAYHER SystemScaffolding | Mast ClimbingWork Platforms | ConstructionHoists |
✓ | ✓ | ✓ | ✓ |
our services
We have our own stock of scaffolding system, our own fleet of vehicles and our own teams of qualified staff. We have contracts managers who ensure that your construction project can progress as planned, however challenging the conditions, and engineering and safety specialists.
what our clients say…
“Well done to the entire team. Calm professional and in control … a great deal of personal effort in challenging conditions. Many thanks.”
“Great job everybody, really well done.”
contact us
We welcome all enquiries. Make the change to alliedaccess.
call: 0845 296 8854
email: info@alliedaccess.co.uk
By submitting the above form you consent to alliedaccess processing your information in accordance with our privacy policy.